Flooring advice
Preparing the subfloor for PVC flooring
A beautiful PVC floor starts underneath. Unevenness in the subfloor will show and be felt later. That is why preparation matters at least as much as installation itself.
In short
- The subfloor must be flat, dry, clean and sound.
- SPC click has an integrated underlay; leave an expansion gap.
- LVT dryback: usually level first, and preferably have it installed by a professional.
The four requirements: level, dry, clean, solid
- Level. Bumps and dips show through, especially with a thin glued floor.
- Dry. A (new) screed must be completely dry. A professional measures the residual moisture.
- Clean. Dust, adhesive residue and grease prevent good adhesion or cause unevenness under the floor.
- Solid. Repair loose parts, cracks or springy boards first.
SPC click: installed floating
An SPC click floor is 6 mm thick and has an integrated 1 mm IXPE underlay, so no separate underlay is needed. Because SPC is rigid, it bridges small irregularities better than a thin floor, but the subfloor still needs to be level.
- Leave an expansion gap along all walls.
- On a stone subfloor, lay a moisture barrier if your installer or dealer advises it.
LVT dryback: fully glued
An LVT dryback floor is 2.5 mm thick and fully glued to the subfloor. Here the subfloor is even more important:

- The floor is usually levelled first for a perfectly flat surface.
- The subfloor must be suitable for gluing.
- A dryback floor is best prepared and installed by a professional.
Existing floor: remove it or lay on top?
- Tiles: sometimes you can lay on top after levelling; otherwise the grout lines show through a glued floor.
- Wooden floor or boards: must be solid and level; often a board material is laid on top first.
- Carpet and soft floors: always remove.
Acclimatisation
Leave the boxes in the room where the floor will be laid for a while, so they reach room temperature. Your installer or dealer will tell you how long.
Need help?
Find a dealer near you: they can assess the subfloor and install the floor for you. Read also PVC flooring on underfloor heating.
How to check flatness yourself
Place a long, straight edge or spirit level on the floor in several places and directions. If you see clear gaps under it or feel bumps, the subfloor is not flat enough and levelling is wise.
Also look for cracks, loose tiles and spots that flex when you stand on them. Repair those first. If in doubt, have your dealer or installer assess the subfloor.
Frequently asked questions
What must the subfloor meet?
The subfloor must be level, dry, clean and solid. For LVT dryback it must also be suitable for gluing.
Do I need to level the subfloor?
For a glued LVT dryback floor, levelling is usually needed. For SPC click it depends on how level the subfloor is.
Can I lay PVC flooring on tiles?
Sometimes, after levelling. With a glued floor the grout lines can otherwise show through. Have the subfloor assessed by a professional.